Sky-two
Sky-two
Application
– Rooftop where cracks are severe,
– Building shaking excessively by vibration, apartment rooftops
– External walls of villas (water paint construction surfaces, cracks, water leakage)
– Building shaking excessively by vibration, apartment rooftops
– External walls of villas (water paint construction surfaces, cracks, water leakage)
Product configuration
Sky-two is high-performance / high-quality waterproof solvent for membrane having excellent durability, adhesion, and water resistance.
Product characteristics
– It is the newest material that has improved the weak points of previous waterproof solvent used on membrane and it can be attached to moist areas.
– It is the newest material having the characteristics of coal and strong point of waterproof solvent and it can be easily applied for construction.
– Undiluted solution and powder should be stiffened and construction should be carried out using hera (used as crack cover).
– It can be applied for different purposes. (construction of bathhouses, alternative method for polyurethane construction, septic tanks, basements, leakage in every crack, top coating for water paint, inside water tanks)
product name | Specification | Shape | Remark |
Sky-one (undiluted solution) | 18 | White liquid | liquid |
Powder | 16kg | Dark gray | Powder |
Product characteristics
Recommended thickness | 1,500㎛ |
Usage per package | 33ℓ 100㎡ / 18ℓ 50㎡ / 4ℓ 10㎡ |
Tools | roller, Hera |
How to use and caution
How to use | – Remove the foreign substances and laitance and mix the undiluted solution and powder sufficiently with hand mixer. – Apply paint thoroughly using water paint roller. – 2nd construction should be carried out after complete drying (3 hours at 20℃, when walking is possible). – 3rd construction should be carried out depending on the judgment by the operator. External walls such as water paint wall should be finished with 2nd construction and 3rd construction should be only applied to the rooftop floors that are 150 m2 or bigger and general floors. – Amount of water should be determined so that construction can be convenient, but excessive amount may lead to thin membrane and reduced waterproofing.*Criteria for water amount ※ If the rooftop or cracked walls are repaired, it can provide a clear effect. |
---|---|
caution | – Before carrying out 2nd construction, check for the drying status after 1st construction. (status where construction surface is not lifted when scratched with nails or tools and where walking is possible) – In shady areas like basements, water tanks, and septic tanks, touch drying is possible 2–3 hours later. – In case of summer, it is recommended that construction is not carried out between 12 a.m. and 2 p.m. In case of winter, it is recommended that construction is carried out between 11 a.m. and 2 p.m. – Do not carry out construction when the temperature is under -5℃.(freezing might occur) – In case of construction on drinking water tanks or fisheries, wash out using water or apply finishing painting with water-soluble epoxy. |